Title 24 Energy Compliance in Menifee, CA
Title 24 energy compliance is a California state requirement that every new ADU permit set must satisfy before the city of Menifee will issue a building permit. The compliance report documents that your ADU meets the California Energy Code’s insulation, glazing, HVAC, water heating, and lighting standards – and without it, your permit application is dead on arrival. At Ellery ADU Studio Menifee, we prepare the Title 24 report as a built-in part of our ADU Design & Permitting services, not a late add-on you discover is missing the week you planned to submit.
If you’re already working through the broader permitting picture, our ADU Design & Permitting in Menifee page walks through how Title 24 fits inside the full permit set. Or call us directly at (951) 528-2967 – a live person picks up, no voicemail queue.
Menifee’s inland location matters here. The city sits in Climate Zone 10, where summer design temperatures regularly exceed 105°F in neighborhoods like Audie Murphy Ranch, Centennial, and Heritage Lakes. A Title 24 report written for Zone 10 has meaningfully different envelope requirements than one written for a coastal project – higher ceiling insulation minimums, stricter duct sealing thresholds, and more demanding window Solar Heat Gain Coefficient (SHGC) limits. Getting the climate zone wrong is a common mistake on permit sets prepared by designers who work across too many regions without adjusting their inputs. We only work in the Inland Valley and Temecula/Menifee corridor, so Zone 10 is what we know.
When You Need Title 24 Energy Compliance
- You’re applying for an ADU permit in Menifee. The City of Menifee Building & Safety Division requires a compliant Title 24 energy calculation report as part of every new ADU submittal – whether it’s a detached unit, a garage conversion, or a junior ADU carved from existing square footage.
- Your permit was rejected or flagged for a missing or incorrect energy report. If your first submittal came back with a plan check comment citing the California Energy Code (Part 6, Title 24), you need a corrected report prepared by someone who can read the rejection comment and respond to it line by line.
- You’re building with a prefab or modular system. Brands like Plant Prefab and Mighty Buildings ship with factory documentation, but that documentation still needs to be reconciled with California’s prescriptive or performance method and submitted as part of the Menifee permit package. The factory cert alone does not satisfy the city’s Energy Commission requirements.
- Your ADU involves a new HVAC system, mini-split, or heat pump water heater. Equipment selection affects the Title 24 calculation directly – swapping a water heater type or adding a ductless mini-split after the report is submitted can require a revised calculation and re-submittal, costing weeks.
- Your existing drawings were done by someone else and you need a compliance check before construction starts. We see this frequently in Menifee’s newer tracts, where homeowners hired a drafter for the plans and then discovered no energy calculation was ever attached. We can audit the drawings, run the calculation, and produce the report without redrawing the project from scratch.
- You’re converting a non-conditioned garage to a conditioned living space. Garage conversions require a full Title 24 analysis for the new conditioned area – the existing walls, roof assembly, and any new penetrations all go into the calculation.
Our Title 24 Energy Compliance Process

- Site and drawings review. Before we run a single calculation, we pull the project drawings and the site data: lot address, building orientation, roof pitch, wall assembly specifications, window schedule, and the HVAC and water heating equipment selections. For Menifee projects, we confirm the Climate Zone 10 assignment in CHEERS (the California Home Energy Rating System registry) and flag any assemblies that are going to be tight against the code minimum before the calculation is even run.
- Compliance method selection – prescriptive versus performance. California allows two paths: the prescriptive method (follow a fixed table of minimums) or the performance method (run the whole-building energy model and show that the design performs at least as well as a code-minimum reference building). For most Menifee ADUs, the performance method gives more design flexibility – particularly when the homeowner wants larger south- or west-facing glazing, which is common in Heritage Lakes and Audie Murphy Ranch floor plans. We select the method that gives your design the most room and document why.
- Energy calculation and CF1R/CF2R preparation. We prepare the CF1R (Certificate of Compliance, the document that goes into the permit set) and the CF2R (Installation Certificate, which the field inspector signs off during construction). Both documents are generated using HERS-compliant energy modeling software and carry our stamp. The CF1R is what the city plan checker actually reviews; a missing or unsigned CF1R is the most common reason energy-related plan check comments are issued in Menifee.
- Coordination with the permit set. Because Ellery operates under a single design-build contract, the energy report is coordinated directly with the architectural drawings, structural sheets, and MEP notes before submittal. There is no separate energy consultant handing off a PDF to a designer who has never seen it – the calculation and the drawings are reconciled by the same team. This matters at plan check: inconsistencies between the energy report and the construction drawings (a common cause of corrections) are caught internally rather than by the plan checker.
- Plan check response, if required. If Menifee’s Building & Safety Division issues a comment on the energy portion of your submittal, we respond to it. Responses are written to the specific code section cited, not to a generic template. In our experience working in Menifee, the most frequent energy-related corrections involve duct sealing documentation and HERS verification requirements for new HVAC systems – we address those upfront so the response, when needed, is a one-round fix.
- HERS rater coordination at inspection. Some Title 24 compliance measures require third-party verification by a certified HERS rater during or after construction – particularly duct leakage testing and blower door tests for tight-construction claims. We coordinate directly with the HERS rater so the field inspection timing aligns with construction milestones rather than creating a scheduling bottleneck at final.
Title 24 Energy Compliance Pricing in Menifee
Title 24 compliance work for an ADU in Menifee typically ranges from $650 to $1,800, depending on the complexity of the project. Here’s what drives cost within that range:
- Project type and size: A straightforward junior ADU conversion under 500 square feet with simple wall assemblies and a single mini-split runs toward the lower end of the range. A new detached ADU with a complex roof geometry, multiple exposure orientations, and a solar-ready configuration runs higher.
- Method selected: Prescriptive compliance for a simple design is less labor-intensive than a full performance energy model. When the performance method is the right call – usually because the design’s glazing or orientation would fail prescriptive limits – the calculation takes longer and is priced accordingly.
- HERS verification scope: If your mechanical design requires field verification (duct leakage testing, refrigerant charge verification, or infiltration testing), coordinating the HERS rater adds to the project cost. We quote this separately so you see exactly what you’re paying for.
- Revisions after the calculation is complete: If the design changes after the CF1R is prepared – a window size increases, the HVAC equipment changes, an insulation assembly is substituted – a revised calculation is required. Under Haven Standard Clause 1, your written quote specifies what’s included and what triggers a revision fee, before work starts.
For ADU projects managed under Ellery’s full ADU Design & Blueprints contract, the Title 24 compliance work is included in the all-in written price you receive before any work begins. You won’t find a separate line item surprise at permit submittal. For clients who already have drawings from another designer and need only the energy report, we quote that as a standalone engagement with a written price upfront – per the same Haven Standard Clause 1 that governs every project we touch.
Call (951) 528-2967 for an exact quote – estimates are free, and a live person will pick up.
What Menifee’s Climate Zone Means for Your ADU Energy Report

Menifee is assigned to California Climate Zone 10 under the Energy Commission’s 16-zone map. Zone 10 covers the inland Riverside County valleys, and it is one of the more demanding zones in the state when it comes to cooling load requirements.
Practically, that means:
- Ceiling insulation minimums in Zone 10 are R-38 or better for most ADU roof assemblies – higher than coastal zones.
- Window SHGC limits are tighter, which affects how much glazing area you can place on west-facing walls before the prescriptive method fails. Neighborhoods like Audie Murphy Ranch, where west-facing lots are common in the newer tract layouts, run into this regularly.
- Duct sealing and HVAC efficiency requirements are stricter than in mild coastal zones – Zone 10 summers load the mechanical system hard, and the code reflects that.
- Solar-ready conduit requirements apply to new detached ADUs over a certain square footage, which affects both the electrical design and the energy report documentation.
If you’re specifying a modular system – a Mighty Buildings unit, for example – the factory envelope specs may or may not meet Zone 10 minimums without supplemental insulation or glazing substitutions. We run that check as part of our intake review, before the calculation is submitted, so there are no surprises at plan check.
Title 24 Inside Ellery’s One-Contract Model
Most ADU projects in Menifee are managed across at least two separate contracts: one with the architect or drafter for drawings, and one with the contractor for construction. When the energy report is wrong or the drawings don’t match the report, each party points at the other. The homeowner pays for the delay.
At Ellery, the drawings, the Title 24 report, and the construction are a single contract at a single written price. The person who stamps the energy report and the person who manages the field crew are working from the same document set under the same contract terms. That’s not a marketing position – it’s how the work is structured, and it eliminates the coordination gap where energy compliance errors typically hide.
That structure is also why our home page describes Ellery as a design-build studio rather than a contractor. The permit set is the product. Title 24 compliance is part of it, not an afterthought attached at the end.
The 365-Day Done Right Promise applies here: if the finished ADU is not built to the permitted drawings – including the energy-compliant specifications in the CF1R and CF2R – we make it right. That commitment is written into the contract before the project starts, not offered after something goes wrong.
FAQs – Title 24 Energy Compliance

Does every ADU in Menifee require a Title 24 energy report?
Yes. Any new ADU permit application submitted to the City of Menifee Building & Safety Division requires a Title 24 CF1R (Certificate of Compliance) as part of the permit package. This applies to new detached ADUs, garage conversions, junior ADU conversions, and additions that create new conditioned floor area. There is no square footage threshold below which the requirement disappears – even a 200-square-foot junior ADU conversion requires the report. Call (951) 528-2967 if you want to confirm what your specific project triggers.
How much does a Title 24 report cost for an ADU in Menifee?
For a standalone ADU energy compliance report in Menifee, expect to pay $650 to $1,800 depending on project size, compliance method, and whether HERS field verification is required - see our full How Much Does ADU Design & Permitting Cost? (2026 Price Guide) - Menifee, CA for details. For clients on Ellery’s full design-build contract, the Title 24 work is included in the all-in written price quoted before any work begins. Either way, you receive the price in writing before we start – that’s Haven Standard Clause 1, and it applies to every project. Call (951) 528-2967 for an exact number on your specific project.
Can I use the energy documentation that comes with a prefab ADU to satisfy the Menifee permit requirement?
Factory documentation from a prefab manufacturer is a starting point, not a finished compliance document. Brands like Plant Prefab ship detailed thermal and mechanical specifications, but those specs still need to be translated into a California CF1R that references your specific lot, orientation, climate zone assignment, and site-installed components. The city plan checker reviews the CF1R, not the factory spec sheet. We reconcile the factory documentation with the California Energy Code and produce the compliant CF1R as part of the permit set.
What happens if my Title 24 report is wrong and the city sends a plan check correction?
Plan check corrections on the energy portion of a submittal are common, and they’re manageable when the same team that produced the report responds to them. When Menifee’s plan checker issues a correction, we respond to the specific code section cited – usually within the plan check review cycle – with a corrected CF1R and any supporting documentation requested. Under Ellery’s single-contract model, you don’t coordinate between a separate energy consultant and a separate designer to get a correction resolved. One point of contact, one contract, one response.
Key Takeaways
- Every ADU permit in Menifee requires a Title 24 CF1R energy report – no exceptions, no square footage minimums.
- Menifee sits in Climate Zone 10, with stricter insulation, glazing SHGC, and HVAC efficiency requirements than coastal California zones.
- Standalone Title 24 reports for ADUs in Menifee run $650-$1,800; for full design-build clients, the report is included in the written all-in price.
- Prefab manufacturer documentation (Plant Prefab, Mighty Buildings, others) does not replace the CF1R – it informs it.
- Ellery’s one-contract model means the energy report and the construction drawings are produced and coordinated by the same team, eliminating the most common source of plan check corrections.
- Every quote is written before work starts, per Haven Standard Clause 1. The words “call for a quote” do not appear here because a real price does.
Get Your Title 24 Report Included in Your Menifee ADU Permit Set

If you’re planning an ADU in Menifee – whether a new detached unit, a garage conversion, or a junior ADU – and you want the energy compliance report handled as part of a complete, coordinated permit package, search ADU Design & Permitting Near Me in Menifee, CA or call Ellery ADU Studio Menifee at (951) 528-2967. A live person answers. We’ll review your project, confirm your climate zone inputs, and give you a written price for the full scope before any work begins. Free second opinion available on any written estimate you already have in hand.
Written by Nadia Ellery, Owner at Ellery ADU Studio Menifee, serving Menifee.